Prepare a useful brief for swimming pool construction, renovation, maintenance, design, fountains or ponds. Choose your service, add the information you know and take the checklist to your project team.

MAZACURE coordinates enquiries across Kerala (Keralam), Tamil Nadu, Karnataka and India from Painkanoor, Valanchery. Visits and delivery arrangements depend on the actual site and appointment.

Need dimensions first? Use the pool-size worksheet →

Start with what you know

What to send with your first enquiry

01 · The site

Town and district, a few current site photographs, access constraints and any available site or architectural drawings.

02 · The pool

Approximate length, width and depth, intended users, ground or rooftop setting, and any skimmer, overflow or infinity-edge preference.

03 · The appointment

Current project stage, preferred programme, budget expectations if known, and whether you need design, construction, renovation or ongoing care.

You do not need complete drawings to begin. Mark unknown items for the site review. Share only project information you have permission to send; attach photographs or drawings yourself when sending the prepared email.

Prepare your enquiry checklist →

Your project checklist

Information entered here stays in this page until you choose to download, print or prepare an email. It is not sent automatically or saved by this tool.

This is a brief-preparation tool, not a price estimate, engineering design or confirmed service booking.

Information to gather

Leave anything unknown blank. Your site review can establish the missing information.

New swimming pool construction

A like-for-like decision

Compare two quotations before comparing totals

For each proposal, mark every item as included, excluded or provisional. Record the specification and responsible party beside the price. An unpriced item is not automatically included.

Swipe horizontally to see all comparison columns.

Use these questions in both contractors’ proposals
ScopeEvidence to requestClarify before appointment
Design and civil worksDrawings, quantities, ground assumptions and structural responsibilityExcavation, disposal, approvals and work by others
Waterproofing and finishesSpecified system, junction details, finish and test sequencePreparation, curing, remedial work and warranty exclusions
Plant and installationEquipment schedule, calculated duties, pipework and controlsElectrical supply, plant room, tanks and replacement access
Testing and handoverAcceptance checks, commissioning records and operator instructionWho signs off, outstanding defects and included documents
Commercial terms and careItemised total, taxes, payment milestones and written service scopeProvisional sums, variations, consumables and travel charges

Decision rule: resolve the exclusions and provisional allowances first. Compare the installed scope and operating assumptions, not a headline area rate alone.

What to compare in a proposal

Agree inclusions, exclusions and responsibility in writing. These checklists are visible even without JavaScript; the interactive brief requires JavaScript.

New swimming pool construction

Use the same inclusion schedule when comparing pool builders. A turnkey price is only comparable when the drawings, materials, site work and handover responsibilities match.

  • Site and shell: Survey information, excavation and disposal, structural design responsibility, shell construction and groundwater measures where needed. Clarify: Ground investigation, rock removal, retaining structures and work outside the pool footprint.
  • Water system and finishes: Waterproofing build-up, finish specification, pipework, filtration, treatment equipment and installation boundaries. Clarify: Plant-room building, incoming electrical supply, drainage connections, deck finishes and balance tank where applicable.
  • Completion and support: Inspection records, commissioning scope, operating information and written warranty responsibilities. Clarify: Acceptance criteria, exclusions, service visits, spare parts and travel arrangements after handover.
Residential and villa pools

A compact courtyard pool, a plunge pool and a family swimming pool use the available space differently. Request a layout showing usable water, the surrounding deck and the equipment together.

  • Daily use: Swimming length, entry steps, benches, desired depth and the way the family will use the pool. Clarify: Steps and ledges reduce swimming space; a plunge pool is not equivalent to a lap pool.
  • Property interfaces: Privacy, access, deck drainage, equipment location and protection of existing buildings and gardens. Clarify: Structural assessment for terraces, utilities relocation, ventilation for enclosed pools and excavation access.
  • Ongoing care: Cleaning access, water testing responsibilities and equipment operation at handover. Clarify: Who handles routine care, what maintenance visits include and which consumables are charged separately.
Hotel, resort and commercial pools

A hospitality or institutional pool needs a proposal that covers the operator's work as well as the guest experience. Declare intended use before equipment and capacity are selected.

  • Users and operation: Intended occupancy, opening hours, activities, staff responsibilities and relevant project requirements. Clarify: Guest pools, training pools and competition facilities need different briefs; certification is a separate requirement.
  • Construction interfaces: Architecture, structure, hydraulic design, plant access and coordinated equipment schedules. Clarify: Building works, electrical supply, drainage, changing facilities, access provisions and scope by other contractors.
  • Handover: Commissioning records, operating procedures, staff instruction and an agreed defects process. Clarify: Maintenance attendance, spares, emergency response, shutdown periods and warranty exclusions.
Infinity, rooftop and overflow pools

An infinity edge and a deck-level overflow are different water-collection arrangements. A rooftop describes the structural setting. Include these decisions explicitly in the proposal.

  • Infinity edge: Viewing direction, weir alignment, collection arrangement and return-water route. Clarify: Catchment and tank space, access below the edge, wind and splash conditions at the actual site.
  • Deck-level overflow: Channel detail, grating or slot finish, tank arrangement and circulation coordination. Clarify: Deck drainage separation, channel cleaning access and finished-level tolerances.
  • Rooftop or podium: Site-specific structural coordination, waterproofing interfaces and maintenance access. Clarify: Loads and approvals by the appointed professionals, leak inspection routes and equipment replacement access.
Pool cost and quotation comparison

We quote against a site and scope. Use published market prices as research, then compare written inclusions, quantities and assumptions before choosing a contractor.

  • Measurement basis: Length, width, depth profile and the precise area or quantity used for each rate. Clarify: A water-surface rate may exclude the deck, tank, plant room, excavation or structural changes.
  • Installed cost: Shell, waterproofing, finish, equipment, installation, testing and the agreed site works. Clarify: Taxes, delivery, access equipment, professional fees, exclusions and provisional allowances.
  • Running cost: Equipment load and operating assumptions, water use, consumables and planned service attendance. Clarify: Heating, tariffs, operating hours and usage materially change estimates; compare the same assumptions.
Pool maintenance and AMC

A pool AMC should make attendance, routine tasks, reporting and exclusions clear. Tell us the actual location and plant condition before relying on a service frequency or response commitment.

  • Routine attendance: Visit frequency, cleaning tasks, water checks and the service report format. Clarify: Tasks between visits, operator responsibilities and additional attendance during heavy use.
  • Consumables and repairs: Specified chemical supply, filter servicing and equipment inspection scope. Clarify: Spare parts, repair labour, replacement equipment, water, power and travel charges.
  • Fault escalation: Contact route, reporting process and agreed response arrangements. Clarify: Emergency attendance is location-dependent; business enquiry hours are not a 24-hour repair guarantee.
Renovation and leak investigation

Water loss, damaged finishes and poor circulation can have different causes. Agree the investigation and access requirements before committing to a full retiling or waterproofing package.

  • Investigation: Fault history, condition review, accessible pipework and an agreed testing approach. Clarify: The inspection limits, tests requiring shutdown and any opening-up work or reinstatement.
  • Remedial scope: Identified repair areas, preparation, compatible materials and equipment changes. Clarify: Concealed conditions, structural assessment, disposal and how additional findings change the price.
  • Return to use: Test records, acceptance criteria, operating checks and relevant warranty scope. Clarify: Curing and testing periods, reopening responsibility and future inspection access.
Pool design and technical consultancy

An architectural concept, a hydraulic design and an independent review are different appointments. Define which decisions and documents you need before comparing consultancy proposals.

  • Concept and layout: Use brief, spatial options, water form, edge, entry and plant-space coordination. Clarify: Number of options and revisions, source drawings and the point at which the brief is frozen.
  • Technical coordination: Agreed hydraulic information, equipment schedules, specifications and tender assistance. Clarify: Structural and electrical design responsibility, local approvals, site supervision and quantity verification.
  • Design review: Documents reviewed, stated criteria, findings and a register of unresolved information. Clarify: A review is limited to its agreed scope; it does not automatically certify every aspect of a facility.
Fountains and water features

A fountain, cascade, water wall and reflective basin need different effects and maintenance arrangements. Describe the intended setting and water contact before selecting pumps or finishes.

  • Visual and acoustic effect: Desired jet or sheet, viewing distance, sound, lighting and operating hours. Clarify: Wind, splash, overspray, nearby finishes and whether the effect requires an on-site sample or test.
  • Water and controls: Basin, circulation, treatment, make-up water, overflow and the agreed control sequence. Clarify: Musical or synchronised effects, interactive use and specialist control work require a defined brief.
  • Cleaning and access: Reachable strainers, pumps, tanks, wetted surfaces and drainage points. Clarify: Access panels, isolation, replacement routes and who maintains the feature after handover.
Garden and decorative ponds

A reflective garden pond, planted pond and koi pond are different systems. Define the intended life in the water and who will maintain it before choosing circulation or treatment.

  • Use and habitat: Decorative purpose, planting, fish species where relevant and the intended stocking plan. Clarify: Species-specific water and care requirements need appropriate specialist input.
  • Site and circulation: Levels, lining or waterproofing approach, overflow, circulation and service access. Clarify: Rainwater entry, leaf debris, landscape interfaces and how sludge will be removed.
  • Ongoing care: Cleaning access, filtration responsibilities and agreed operating instructions. Clarify: Pond ecology is not guaranteed by a design image; swimming-pool treatments must not be assumed suitable for fish.

Evidence to request before an appointment

Ask for comparable completed-project photographs with their location and actual scope, relevant references where permission is available, the written warranty and exclusions, and a named service contact. MAZACURE design-library visuals are concepts unless a page identifies a completed project.